PORTFOLIO

New York City Transit Start‑Up: Thermon Heat Trace System 

Thermom Heat Trace Cable

Project Overview

Steam‑fed heat trace solution for safer, more reliable transit operations 

Introduction: Facility Profile and Project Stakes 

A major transit authority in New York City needed a reliable way to protect exposed piping and track‑adjacent infrastructure from freezing conditions. Winter weather and temperature swings were putting pressure on operations, maintenance teams, and safety protocols. Lawrence Lowy Associates (LLA) was asked to support a start‑up of a Thermon heat trace system designed specifically for this transit environment. The stakes were straightforward: keep critical systems above freezing, reduce weather‑related disruptions, and protect passengers and equipment without adding excessive complexity to day‑to‑day operations. 

Project Overview: Existing System Constraints and Risks 

Before this project, cold‑weather protection relied on a mix of local measures and operator vigilance. That approach left the transit authority exposed to several risks: 

  • Temperature‑sensitive piping and components were vulnerable to freezing during prolonged cold snaps. 
  • Staff needed to dedicate time to manual checks and reactive interventions. 
  • Any weather‑related failure could immediately impact service reliability and passenger safety. 

In a dense, high‑traffic urban environment like New York City, even short service interruptions can create congestion, schedule ripple effects, and increased operating costs. The authority needed a more systematic, engineered solution to keep key assets within safe temperature ranges. 

Solution: Selected Equipment and System Design Rationale 

LLA supported the deployment and start‑up of a Thermon heat trace system tailored to the transit authority’s operating conditions. This solution was selected because it: 

  • Provides consistent, controlled heat input  
  • Electric heat trace maintains piping and exposed components above critical temperatures. 
  • Integrates with existing infrastructure  
  • The system can be applied to targeted segments without rebuilding the entire network. 
  • Improves safety and reliability  
  • Automatic operation reduces the risk of freeze‑related failures and emergency responses. 
  • Supports long‑term maintainability  
  • A structured, vendor‑supported system is easier to document, inspect, and service than ad‑hoc measures. 

By standardizing on a Thermon platform, the authority gains a repeatable approach it can extend to additional lines or facilities over time. 

Consultative Execution: Engineering Approach and Coordination 

LLA’s role focused on helping the transit authority move from concept to a stable, field‑ready system. The team: 

  • Evaluated operating conditions and risk points  
  • Reviewed exposure to wind, ambient temperatures, and water accumulation risks. 
  • Identified segments where heat trace would deliver the most operational value. 
  • Coordinated with Thermon and the authority’s internal teams  
  • Aligned installation details with existing power, controls, and access constraints. 
  • Ensured mounting, routing, and protection of heat trace matched site realities. 
  • Supported start‑up and knowledge transfer  
  • Assisted with initial energization and verification of system performance. 
  • Helped operations and maintenance staff understand inspection points and key indicators. 

This engineering‑driven approach reduced uncertainty around the new system and helped the authority embed heat trace into its broader winter operations strategy. 

Results & Operational Impact: Post‑Installation Performance 

Once the Thermon heat trace system was brought online, the transit authority gained a more controlled and predictable response to cold weather. The project delivered: 

  • Improved freeze protection at known risk locations  
  • Exposed piping and components now maintain safer temperature margins during cold periods. 
  • Reduced reliance on manual interventions  
  • Operators and maintenance teams spend less time on reactive checks and emergency measures. 
  • Higher confidence in winter operations  
  • The authority can enter severe weather events with a clearer, engineered protection layer in place. 

These improvements support more consistent service, lower risk of weather‑related incidents, and a better experience for passengers and staff during winter months. 

Why This Matters for Similar Facilities and Applications 

Transit systems, campuses, and large industrial sites across New York and New Jersey face similar freeze‑protection challenges. Exposed piping, critical control lines, and outdoor equipment can all be vulnerable in sustained cold weather. This project shows how a structured heat trace system, supported by an engineering partner like Lawrence Lowy Associates, can help: 

  • Reduce the likelihood of weather‑driven outages and safety events. 
  • Shift staff effort from reactive freeze protection to planned inspection and maintenance. 
  • Establish a scalable template for future cold‑weather protection projects across the network. 

The same approach can be applied to rail facilities, utility corridors, and campus‑scale infrastructure where cold weather poses recurring risk. 

Request a Free Specification Quote 

Lawrence Lowy Associates helps transit authorities, campuses, and industrial facilities in NJ/NY design and implement steam and heat trace solutions that improve safety and winter reliability. If your operation faces recurring freeze‑protection concerns, request a free specification quote to review your current exposure points, control requirements, and installation constraints. LLA will evaluate your existing systems and outline a heat trace and control strategy engineered to reduce risk and support dependable cold‑weather operation. 

Featured Projects

Lawrence Lowy Associates Latest Heat Trace, Heat Exchanger, Water Heater, and Boiler Installations in the NJ / NY Area.

P-K Duration Water Heater
Hudson Yards

Hudson Yards Lawrence Lowy Associates is proud to provide reliable hot water to New York City’s largest real estate development

Read More
goldman sachs tower
Goldman Sachs

Lawrence Lowy Associates is proud to provide reliable hot water to the $2.1B LEED gold certified headquarters building for Goldman

Read More
equinox fitness
EQUINOX Fitness

Lawrence Lowy Associates is proud to provide reliable hot water to the prestigious Equinox Fitness at Rockefeller Center with two

Read More
delta airlines
Delta Airlines

Lawrence Lowy Associates is proud to have supplied Delta Airlines with several miles of Thermon heat trace cable over the

Read More
citifield
Citi Field

Lawrence Lowy Associates is proud to have supplied Thermon heat trace cable to the world-famous Citi Field stadium.  Thermon self-regulating

Read More
columbia university
Columbia University

Lawrence Lowy Associates is proud to maintain a decades long partnership with Columbia University spanning 30+ Patterson-Kelley COMPACT water heaters

Read More
Atlantic Yards Brooklyn
Atlantic Yards

Lawrence Lowy Associates is proud to serve a variety of new construction projects throughout New York City and New Jersey

Read More